Article 10. Comprehensive Building Fee Schedule
6-10-1. Purpose: The purpose of this Article 10 is to consolidate all Village fees and charges related to plan review, permitting, inspection and other activities related to building and construction related activities into one article of Chapter 6 of the Municipal Code for ease of reference and administrative purposes.
6-10-2. Applicability: Each fee, charge, or rate set forth in this Article 10 shall apply to the provisions of the corresponding section of the Municipal Code of the Village of Deerfield as set forth below. To the extent that any fee, charge or rate referenced in this Article 10 is inconsistent with any provision contained elsewhere in the Municipal Code, the provisions of this Article shall control.
6-10-3. Schedule of Chapter 6 Fees, Charges and Rates:
|
Description |
Amount |
Corresponding Section of the Municipal Code |
||||||
A |
Board of Building Appeals fee |
$175 |
2-140 |
||||||
B |
Construction Permit fee for New Single Family and Two Family Residential Construction, per square foot area i. Basement ii. Crawl Space iii. First floor iv. Second Floor v. Third Floor vi. Garage Attached vii. Garage Detached ix. Porch Open x. Porch Enclosed |
|
6-6(a) |
||||||
C |
Commercial and Industrial Building permit fee, per square foot area |
Repealed |
6-6(b) |
||||||
D |
Construction permit fee for all types of construction other than New Single Family Two Family Residential Construction |
Based on estimated cost of construction, $23 per $1,000 for the 1st $10,000 of estimated cost, and $17.20 per $1,000 for each $1,000 of estimated construction cost, or fraction thereof, thereafter |
6-6(d) |
||||||
E |
Passenger, Freight, Hand Elevators, Power Operated Dumbwaiters, Moving Stairways or Similar Hoisting Devices i. Initial certification ii. Temporary use permit iii. Semi-annual inspection, testing and certification |
$30 $30 $30 |
6-6(f) 6-6(f) 6-6(f) |
||||||
F |
Heating Permit for New Single Family and Two Family Residential Construction |
$40 per 1,000 sq. ft. of living space |
6-6(g) |
||||||
G |
Inspection/Reinspection Fee |
$50 |
6-6(h) |
||||||
H |
Certificate of Occupancy/Compliance Inspection |
$100 |
6-6(i) |
||||||
I |
Residential Construction Plan Review Fees, based on estimated cost of construction |
Estimated Construction Cost = Fee: up to $5,000 = $20 $5,001 to $15,000 = $50 $15,001 to $50,000 = $100 In excess of $50,000 = $150 |
6-6(j) |
||||||
J |
Commercial Construction Plan Review Fees based on estimated cost of construction |
Estimated Construction Cost = Fee: up to $50,000 = $100 $50,001 to $100,000 = $200 $100,001 to $500,000 = $400 In excess of $500,000 = $600 |
6-6(j) |
||||||
K |
Extension of Building Permit |
$0.50 per $1,000 of estimated construction cost per month of extension |
6-19(d) |
||||||
L |
Permit to remove building or structure to a Different Lot |
$1 per $1,000 of the estimated value of the building or structure in its completed condition after removal to a new lot |
6-32(a) |
||||||
M |
Relocation of a Building or Structure to a New Location within the Same Lot |
$4 per $1,000 of the estimated cost of moving, including new foundations work necessary to put the building or structure in a usable condition in its new location |
6-32(b) |
||||||
N |
Fee for Demolition of a Building or Structure |
$100 for each 1,000 sq. ft. or fraction of the gross area of the lot upon which the building or structure is located |
6-33 |
||||||
O |
Swimming Pool Permit Fees |
Based on estimated cost of the erection or construction of the swimming pool: $23 per $1,000 of the 1st $10,000; $17.20 per $1,000 for each $1,000, or fraction |
6-51 |
||||||
P |
Electrical Permits i. Base electrical permit fee ii. Fixture installations iii. Heating and other installations iv. Sign installations v. New service/upgrade |
$25 plus $1 for each electric device opening $1 per fixture KVA fee = $1 $4 per square foot $75 |
8-4 |
||||||
Q |
Sewer Tapping/Inspection fee i. Licensed Plumbing Inspector (Independent Contractor) ii. Single Family/sanitary connection and inspection iii. Single Family/storm connection and inspection iv. Commercial Zoned Property/sanitary connection and inspection v. Commercial Zoned Property/storm connection and inspection vi. Industrial, Office and Research Zoned Property /sanitary connection vii. Industrial, Office and Research Zoned Property /storm connection viii. Special Use Zoned Property sanitary connection ix. Special Use Zoned Property storm connection x. Multi-Family Zoned Property/sanitary connection and inspection xi. Multi-Family Zoned Property/storm connection and inspection |
Consultant fee plus 15% $300 connection/$50 inspection $200 connection/$50 inspection $1000 per acre connection fee $200 inspection fee $400 per acre connection fee $200 inspection fee $1200 per acre connection fee $400 per acre connection fee $1200 per acre connection fee $400 per acre connection $80 per unit connection fee $20per unit inspection fee/$50 minimum $60 per unit connection fee $20 per unit inspection fee/$50 minimum |
8-4 16-5 |
||||||
R |
Residential Driveway Permit |
$50 $100 Deposit for each 10-feet in driveway width, or fraction thereof |
19-24(d) |
||||||
S |
Commercial Driveway Permit |
$50 $500 Deposit |
19-31 |
||||||
T |
Street Opening Permit |
$50 $1,000 Deposit plus $30 per sq. ft. of openings that are in excess of 4' x 4' |
19-36(c) |
||||||
U |
Fence Permit |
$50 |
19-62 |
||||||
V |
Water Permit, Meter and Connection Fees i. Meter ii. Roundway iii. “B” Box iv. Corporation v. Fittings vi. 1inch tap, 3/4 inch meter vii. 1inch tap, 3/4 inch ROM viii. 1inch tap, 1 inch meter ix. 1inch tap, 1 inch meter x. 1inch tap, 1 inch meter xi. 1inch tap, 1 inch meter xi. Larger than 1inch tap x. Commercial Tap fee xi. Industrial Tap fee |
Cost of Meter (F.O.B.) plus 15% Cost of Roundway (F.O.B.) plus 15% Cost of “N” Box (F.O.B.) plus 15% Cost of Corporation (F.O.B.) plus 15% Cost of Fittings (F.O.B.) plus 15% $125 tap fee; $80 future repair; $80 inspection $125 tap fee; $80 future repair; $80 inspection $125 tap fee; $80 future repair; $80 inspection $125 tap fee; $80 future repair; $80 inspection $125 tap fee; $80 future repair; $80 inspection $125 tap fee; $80 future repair; $80 inspection $ tap fee (see below);$150 future repair; $15 inspection $200 per acre (or faction), plus $400 per inch of tap $300 per acre (or faction), plus $400 per inch of tap |
23-5 23-7(A)(1) 23-7(A)(1) |
||||||
W |
Air Condition System Permit i. Permit to install new Ii. Permit to alter/modify |
$1 per ton of refrigerant. Plus $20 $1 per ton of refrigerant. Plus $20 |
23.26(A) |