Paving Tomorrow on Rosewood Ave & Price Lane (Friday, July 22, 2022)

Posted on July 21, 2022 at 4:03 PM by John Guccione

Asphalt "base" paving is scheduled to take place tomorrow (Friday, July 22, 2022), on both Rosewood Ave and Price Lane. 

Rosewood paving begins at 7 a.m. (early start approved by Village Manager). Price Lane paving is estimated to begin around 10 a.m. (will follow Rosewood).

During the paving operation, the contractor will place 5 inches of asphalt. Roadway paving will result in a temporary closure of the roadway.  Access shall always be provided for emergency vehicles when required.  Once the asphalt has reached the required compaction and has had time to cool, traffic will be permitted back on the roadway. Traffic is usually allowed on the new pavement within 1-2 hours after placement. 

***Paving is also planned to take place on Saturday for Montgomery, Longfellow, Hermitage, Whittier, Kipling and Byron.   Another update will be sent tomorrow with specifics regarding Saturday's paving operation.

_________

Paving operations will include heavy truck traffic and will present major delays to through traffic. During this time and if possible, please avoid the construction operations and utilize adjacent roadways. All driveways will be accessible at the completion of each work day. 