View All Posts

May 09

Paving Tomorrow on Central Ave & Kenmore Ave

Posted on May 9, 2018 at 3:28 PM by John Guccione

Paving was canceled today on Central Ave and Kenmore due to rain. However, paving of hot mix asphalt will take place tomorrow on Central Ave & Kenmore Ave.

Reminder, fresh oil has been placed on the streets. This oil allows for a better bond to the existing roadway and lengthens the service life of the new pavement. Residents are advised to drive slowly during this time to prevent oil from splashing on their vehicles. The contractor has installed ‘FRESH OIL’ signs to notify motorists. 

Paving operations often include heavy truck traffic and may present minor access delays to residential driveways and to through traffic. During this time and if possible, please avoid the construction operations and utilize the alternate routes. All driveways will be accessible at the completion of the work day.