LAST WEEK

This week, the contractor began parkway restoration, concrete driveway installation, and continued brick driveway installation.

SCHEDULE

Next week, the contractor will complete all driveways with the asphalt driveways planned to take place mid to late week next week. The reinstallation of asphalt driveway will impact driveway access only during the actual installation which is generally under a couple hours. Residents will be notified prior to the work taking place. The contractor will also be working to install new topsoil within the parkways.


Once the parkways are filled with topsoil, the contractor will reinstall the mailboxes and install the new trees. For the trees, the Village Arborist performed a walk through of the site and recommended the proposed locations. However, due to existing shade from nearby trees, these locations are limited.

THANK YOU FOR YOUR CONTINUED PATIENCE.