Brierhill Construction Update - 7/28/2017

Posted on July 28, 2017 at 11:21 AM by Tyler Dickinson

Deerfield Logo small

Village of Deerfield

Brierhill Road Project Construction Update – 7/28/2017

LAST WEEK

This week, the contractor continued to install the new ribbon curb and backfill the completed curb.

SCHEDULE

Curb

The contractor will continue to install the new curb next week. They are hoping to complete the remaining curb next week and will work this Saturday to help ensure they do so. As previously discussed, impacts to driveways may require coordination amongst neighbors as parking in neighboring driveways may be needed. Outside of construction hours, parking in front of homes will be permissible. Notifications with additional information will be delivered to residents prior to driveway impacts.

Paving

In the next 1-2 weeks, the contractor will pave the roadway with the first layer of asphalt. However, due to the width constraints of the roadway and curbs, traffic will be unable to pass the paving operations during the paving of Brierhill Rd. Therefore, the Village has authorized the contractor to pave at night to help limit any impacts to daytime motorists. This work will begin on the south end in the evening and may take up to 12 hours to complete. The specific date and times have not been determined but will be communicated as soon they are determined. The Village will be working with the contractor to give as much advance warning to all residents as possible prior to the paving.

Overall Schedule

Once the roadway is paved, the contractor will turn their attention to restoring the driveways and parkways that were disturbed during the project. This work will most likely take the contractor beyond the original August 15th completion date as they have lost time due to the abnormal amount of rain we have seen this year. The contractor will be required to wait until September to complete the sodding and then the final surface of asphalt.


THANK YOU FOR YOUR CONTINUED PATIENCE.

 

 Please be advised that the information communicated here is a forecast of proposed operations, which may change due to contractor availability and/or weather conditions.