Woodvale Ave Update - 6/28/2020 - Paving Monday

Posted on June 28, 2020 at 8:24 PM by Tyler Dickinson

June 28, 2020


REMINDER - FINAL PAVING PLANNED FOR MONDAY

As previously communicated Friday, the contractor anticipates completing the final paving tomorrow. Please be aware that this work will result in a full closure of Woodvale Avenue and Woodridge Court for the day. See below for a copy of the notice that was distributed on Friday with additional information.


DATE OF NOTIFICATION: June 26, 2020

This is a courtesy notice to inform you that weather depending, the final layer of paving has been scheduled to take place on Monday, June 29, 2020. Due to roadway limitations, Woodvale Avenue and Woodridge Court will be closed to all traffic for the day.  Traffic will be allowed back onto these streets by the end of the day and all driveways will be accessible at the end of the day as well.

Since the roadway will be closed,
residents that need vehicular access during the day of paving are encouraged to park their vehicles on nearby side streets prior to 7a.m. Monday morning. When parking on side streets, please be mindful of driveways and park in a manner that will allow the paving trucks to travel up and down the roadway.


WEATHER
This schedule is 100% weather dependent. Weather today and over the weekend could have additional impacts on the contractor’s schedule which may result in this schedule changing. Please check the project’s website/blog via the Village’s website for any updates that may come up prior to the pave. All updates will be given via this website.

Prior to this final asphalt layer, the contractor is required to install fresh oil to the existing pavement. This work will occur at 4 am the morning of the pave. “Fresh Oil” signs will be installed throughout the time period when asphalt paving will occur. The use of fresh oil helps different layers of asphalt to adhere to one another providing a longer lasting final product. Residents should be mindful of driving through fresh oil. If motorists must drive through fresh oil, please do so slowly. Driving at higher speeds through fresh oil may cause the material to adhere to the undercarriage and/or fenders of the car, which can be difficult and costly to remove.

The Village appreciates your effort in helping to complete this improvement. If you have any questions or need additional information, please contact the Village of Deerfield Engineering Department at 847-317-2490 and request to speak with someone regarding the Project.