Construction Forecast for the week of 4/24/2017

Posted on April 21, 2017 at 2:19 PM by John Guccione

This construction forecast is for the week of  April 24, 2017 and contains updates for both the Pine Street and Fair Oaks Ave locations.

PINE STREET CONSTRUCTION FORECAST
Next week the contractor will complete placing concrete at various gaped sections on Pine Street. They will also complete placement of top soil in preparation for sod placement.  Pavement removal will begin the following week, as both the contractor and village do not wish to expose the sub-base until the asphalt plants are open and in full operation.

FAIR OAKS AVE CONSTRUCTION FORECAST
Sewer installation and repairs have been completed on Fair Oaks Ave.

On Monday and Tuesday of next week the contractor will begin removing concrete curb on the north side of the Fair Oaks.  Access to residential driveways will be maintained for residents on the northern portion of Fair Oaks using temporary driveways made of aggregate stone material. Residents may experience minor access delays of 15 to 20 minutes while the existing concrete curbs and sidewalks are being removed and aggregate ramps are installed. Once removal of sidewalk and curbs is completed, the contractor will prepare for the placement of new concrete curb which is planned to take place towards the middle of next week. Residents will be provided additional notification, 48 to 72 hours prior to experiencing driveway access impacts resulting from concrete pours. 

*All operations communicated in this message are subject to change pending weather conditions.

Thank you and drive slowly and safely through construction zones
.