2019 Street Rehab Project

Click here to view the complete project details including scope and locations.

View All Posts

Aug 14

Paving Warrington & Birchwood on Thursday, Friday & Saturday

Posted on August 14, 2019 at 5:05 PM by John Guccione

This blog post provides a mid-week construction update.  Physical notices have been delivered to residents of Warrington and Birchwood that provide additional details relative to these upcoming paving operations.

Warrington:   ACTIVE
Thursday, August 15: Paving will take place on Warrington from Deerfield Road to Warwick Road.
Friday, August 16:   Continue preparing subbase on north end of Warrington for paving on Saturday.
Saturday, August 17:  Paving of Warrington from Warwick to Woodvale will take place on Saturday. 

Birchwood Ave:     ACTIVE

Thursday, August 15: The contractor will continue preparing the stone base in preparation for paving.
Friday, August 16:
Paving is planned for Birchwood Ave. from Rosewood to Central.

In order to complete paving operations, both Warrington and Birchwood will be closed to through traffic during daytime operations.. 

Paving operations will include heavy truck traffic and will present major delays to through traffic. Please avoid the construction operations and utilize adjacent roadways. All driveways will be accessible at the completion of the work day.