Construction operations will proceed next week as the contractor prepares for a concrete curb pour that is planned to take place on Tuesday, April 4, 2017 (weather dependent). The contractor will also pour sidewalk 2-3 days after the curb.

Tuesday's concrete pour will impact driveway access for residents on the west side of Pine Street, the north side of Laurel Ave and all of Terrace Court. Residents who will be impacted have been notified using physical notifications. 

Next week's operations will result in heavy truck traffic that may present delays to motorists within the construction limits. The roadway will remain open for those who reside on Pine Street. However, we do advise residents to park away from the construction area and to avoid Pine Street during daytime construction operations.

Please drive carefully through the construction zone.